Planning Your Remodel

On this page

3.2 Your Remodeling Journey

Planning takes longer than you might expect, and it is the part that decides whether the rest of your project holds together.

Our process moves through five stages: getting aligned on fit and goals, discovery in your actual space, defining the investment through ballpark and design, planning the proposal and project setup, then construction and closeout.

That order exists so you can change course while the changes are still on paper. A different layout, finish, or phase changes the scope and the price, and it is far easier to work through those choices before trades are scheduled and materials are ordered.

The time between signing your agreement and starting construction depends on selections, your preferred start date, material lead times, and the work needed to prepare your project. It can be about a month or extend to six months or longer. Your first conversations and design work add time before signing, so we’ll work through the expected timing for your project with you.

Here’s RJ Crai, our Project Development Manager, on why we’d rather use that time than compress it:

“It is much more beneficial for you to not rush into a job where you're making such a large investment, to make sure you're getting all the i's dotted and t's crossed prior to signing or committing, or even bringing that hammer to nail.”

RJ Crai, Project Development Manager

Semper Fi’s process overview shows the broad path, and the home-remodel planning guide can help you organize your early thinking.

Back to this Manual section

3.3 Site Survey & Feasibility

You’ll have two conversations before anyone visits your home.

The first is short, around 20 minutes, with our Project Development Coordinator. You tell us what you want to change and why, and you walk us through the location, the rooms or structure involved, your priorities, and the range you have in mind. It covers your goals, your timeline, your budget, and what a finished project needs to do for you.

If it looks like a fit on both sides, you’ll talk with one of our Project Development Managers next, and that conversation goes deeper into the scope and the details of the work.

Worth arranging before the visit. Everyone who will weigh in on major decisions should share their goals early, even if they can’t all attend. It’s the simplest way to keep your design pointed in one direction from the start.

The site survey runs about two hours and brings the conversation into the actual space. Expect measurements and photos, and questions about how your household uses the room. We’ll capture interior and exterior measurements, setback lines if we’re looking at an addition, detailed photos, and takeoffs for flooring and walls. Bring any drawings, renderings, or inspiration images you’ve collected.

Existing conditions, access, and how a room connects to the spaces around it all change what a promising idea takes to build. That’s the feasibility question, and it’s why we’d rather stand in your space than work from a description of it.

Watch us walk through the first steps for a homeowner new to remodeling.

Your ballpark figure follows within one to two weeks. It arrives with a scope summary, the factors driving the cost, and the places where cost could come out. Use it to test direction before anyone invests in detailed design.

If the number doesn’t fit, say so. That’s what the ballpark is for:

“If we’re too high, or whatever the case is, we have the ability to really adjust the design, scope, selections, and allowances, all of it, to try to get everything down to where you’re comfortable.”

RJ Crai, Project Development Manager

Having that conversation early can save you weeks of design work on an option you’d never have chosen.

What the ballpark process involves.

Back to this Manual section

3.4 Design & Scope

Once the direction and the ballpark make sense, we’ll develop your project in detail.

A choice that looks small on a drawing can move the estimate more than you’d expect. Moving plumbing, changing a wall, choosing cabinetry, or specifying tile all change the work behind them and the materials that go into it.

A designer comes onto the project when the work calls for it. Some projects also need an architect, engineer, geotechnical professional, or another specialist. A straightforward room update and an addition on a steep lot call for very different levels of investigation, and we’ll tell you which steps apply to yours as the scope comes into focus.

The scope says what’s being built and what’s included. The design and the selection allowances define how it will look and how it will function.

Before you sign, you get a single number, priced to the cent. That’s what makes adjustment possible. If the detailed estimate lands higher than you hoped, you can still change the design, scope, selections, or phasing while everything is on paper. Why a remodel costs what it does covers how we arrive at that number.

Your finished proposal is where those decisions come together, and 3.5 covers what to look for in it.

Back to this Manual section